Transformer Substations and Seaport

1. Transformer Substations – 110KV

Project location: Sichuan Province, China

110KV Tongziping substation circuit breaker replacement and reconstruction project, this time purchase 5 circuit breakers.

Equipment/Service Provided: GE circuit breaker

Contract time: 2018

2. Transformer Substations – 110KV

Project Location: Sichuan Province, China

In this phase of the project, 5 sets of 110kV circuit breakers, 3 sets of 110kV current transformers, and 5 sets of 110kV isolation switches will be replaced.

Equipment/Service Provided: ABB circuit breaker

Contract time: 2019

3. Seaport

Project location: Hebei Province, China

This project plans to build 5 specialized coal shipping berths in Caofeidian port area, the tonnage and quantity of berths are: 1 berth of 50,000 DWT, 2 berths of 70,000 DWT, and 2 berths of 100,000 DWT. The designed annual capacity of the terminal is 50 million tons.

Equipment/Service Provided: ABB electric motor

Contract time: 2015